CS Metals Recovery Intelligence

Inaugural edition · Quarterly Assessment & Forecast, Q3 2026 · Research cutoff November 14, 2026 · The interactive subscriber dashboard is in development; this page previews the research.
CS Metals Recovery Intelligence · Quarterly Assessment & Forecast · Q3 2026

Global E-Scrap Refining: Capacity Expansion, Recovery Economics and the 2027 Outlook

Smelters and refiners are adding electronic-scrap recovery capacity while concentrate smelting earns record-low treatment charges. The disclosures of 11 producers show capacity expanding mostly on paper, flat measured intake and no evidence of better terms for sellers. Competition is moving upstream into collection, ITAD, pre-processing and sampling.

Concentrate benchmark$0/t2026 annual TC/RC, miners–Chinese smelters (2025: $21.25). Spot −$297/t at Sep 30, 2026 (Boliden).
Actual intake18,257 tRönnskär electronics & alloys, Q3 2026; −1.8% year on year. A mixed reporting line, not pure e-scrap.
Designed capacity~60 kt/yrAtlantic Copper CirCular, inaugurated Sep 14, 2026. No throughput disclosed at the cutoff.
Circularity findings39Across 11 companies: 15 Positive, one Negative, six Neutral, 17 Unrated.

Measures are labelled by type throughout: actual intake or output, designed capacity, announced additions, targets and company projections are never combined or ranked against each other.

Executive assessment

Principal conclusions

Seven evidence-based conclusions from the Q3 2026 assessment. Expand each for the supporting evidence.

2027 outlook

Balanced build-out with integration-led competition

New capacity commissions gradually, intake rises unevenly, and refiners compete for feed mainly by securing collection and pre-processing channels while open-market terms change little. Two alternatives are tracked: intensifying competition for qualified e-scrap, and dislocation from policy, outages, funding or prices.

Scenarios and indicators
What would change the assessment

    Need a closer look at the market or a tailored research discussion? Subscribe to CS Metals Recovery Intelligence or arrange a 30-minute scoping call with Compliance Standards.

    11-company comparison

    An analytical sample, not a census: capacities are not summed into market shares. Filter by strategy or processing region, then open a profile. Latest disclosed periods differ by company.

    Company profiles

    Regional intelligence

    Comparative regional outlook for 2027

    Compliance Standards analysis. Evidence confidence reflects the share of primary-source evidence behind each column.

    Facilities & processing capacity

    Facilities in the research sample by disclosure status. Markers show whether the company documents electronic-scrap feed, not capacity. Locations are plotted at municipality level.

    E-scrap feed disclosed by companyIntended or designed; no intake disclosedNo e-scrap feed documented / other recycling

    Actual intake, designed capacity, additions and targets — kept separate

    Rows in different measure types are not comparable. “Electronics and alloys” and “other recycling materials” include non-electronic material. The Crucible figure comes from press reports and covers all products.

    Rönnskär secondary feed, eight quarters

    Electronics & alloys (t)All secondary raw materials (t)

    Source: Boliden, Interim Report Q3 2026, p. 40. Actual intake.

    Copper concentrate treatment charges

    Sources: Benchmark Mineral Intelligence (benchmarks); Boliden Q3 2026 (−297); Argus via Reuters (spot); SMM via The Deep Dive (Oct 9). Spot series are separate observations from different assessors.

    Investment & commissioning timeline

    Company targets as stated at the cutoff, not Compliance Standards forecasts. Hover or tap a bar for detail.

    Ramp-up / commissioning windowConstruction / deployment targetPlanned outageDated eventStatus unconfirmed

    Investment amounts as reported by companies or, where indicated, the press. CirCular figures differ between reports (about €500 million in March 2026; more than €550 million in September 2026).

    Recovery economics

    Contained value is not seller value

    Electronic-scrap lots are valued on sampling and assay. Seller proceeds equal the payable share of contained metal at the quotational-period price, less treatment and refining charges, penalties and costs. No company in the sample publishes electronic-scrap payables or charges, so the model below is structural.

    ComponentDefinitionEvidence in sample
    Payable metalDry weight × assay × payable %, or less a unit deductionNot disclosed by any company
    Gross valuePayable metal × price over the quotational periodCompany price assumptions show intra-period volatility
    Treatment chargePer dry ton of materialAurubis: charges for complex material “improved” (refiner view); other recycling materials “constant”
    Refining chargesPer unit of payable metalNot disclosed by any company
    SettlementProvisional invoice, assay exchange, final settlementUmicore offers toll refining or outright purchase
    Contained value per unit of grade

    Arithmetic on company price assumptions; theoretical values assuming 100% payment and no charges.

    Gold, per 1 g/t$131.82 per dry ton$4,100/oz (DOWA, H2)
    Silver, per 1 g/t$1.83$57.0/oz (DOWA)
    Palladium, per 1 g/t$35.37$1,100/oz (DOWA)
    Copper, per 1%$133$13,300/t (SMM, H2)

    Price risk is material: gold moved from $4,608/oz on March 31, 2026 to $4,176 on September 30 (Mitsubishi Materials), about 9% lower, while settlements were pending.

    Hardware circularity findings

    Impact, evidence classification and confidence are separate judgments; no impact rating is based on financial performance.

    2027 forecast & monitoring indicators

    No numerical probabilities are assigned: the sample provides no base rate. The base case is the scenario most consistent with the evidence at the cutoff.

    Quarterly indicator tracker

    Boliden’s 2027 guidance (December 8, 2026), the EU non-OECD destination list (due November 21, 2026) and the 2027 copper benchmark talks fall after the research cutoff and are not reflected.

    Company scorecards

    Each covered company receives a quarterly scorecard: results snapshot, management statements, sector intelligence, hardware circularity findings with evidence and resolution criteria, peer context and a watch list. Scorecards are available to subscribers.

    Free flagship report

    Download the Q3 2026 Quarterly Assessment & Forecast

    The inaugural edition is distributed without charge: 44 pages, 14 exhibits and 73 source notes covering industry structure, competitive positioning, capacity and investment, recovery economics, four regional chapters, 11 company profiles and the 2027 scenarios.

    Free of charge. Contact Compliance Standards to receive the Q3 2026 edition.

    Inside the report

    • Executive assessment: seven conclusions and the 2027 outlook
    • How the e-scrap refining chain works and who controls outlets
    • Capacity and capital investment, facility by facility
    • The economics of e-scrap recovery and a settlement model
    • North America, Europe, Japan and South Korea, China and the rest of Asia
    • Company intelligence and 39 circularity findings
    • Scenarios, risk matrix and quarterly indicator tracker
    Subscription
    Standalone

    CS Metals Recovery Intelligence

    Contact Compliance Standards for subscription information.

    • Quarterly Assessment & Forecast
    • Individual company scorecards
    • Regional and facility intelligence
    • Quarterly indicators and historical comparisons
    • Interactive intelligence dashboard (in development)
    Included in

    CS Pulse

    Contact Compliance Standards for subscription information.

    • All CS Metals Recovery Intelligence content
    • The broader CS Pulse research service
    Glossary

    Plain-English explanations of the smelting, refining and recycling terms used on this page. Terms marked with a dotted underline show the same explanation when hovered, focused or tapped.

    Sources and methodology

    Research cutoff November 14, 2026. Figures are reported on each company’s own basis and period; actual intake, designed capacity, announced additions, targets and projections are kept separate and are not ranked against each other. Trade-press sources are identified as such. Hardware circularity ratings assess effects on the recovery and reuse of hardware and its materials, not financial performance.

      Need a closer look at the market or a tailored research discussion? Subscribe to CS Metals Recovery Intelligence or arrange a 30-minute scoping call with Compliance Standards.

      © Compliance Standards LLC · CS Metals Recovery Intelligence · Research cutoff November 14, 2026. For information only; not investment advice.Terms & Conditions · CS Trackers